What is Baliyo Ghar Program ?


Baliyo Ghar Program for Safer Reconstruction


In the wake of Gorkha Earthquake2015 and its subsequent aftershocks, Nepal Government has identified the huge need and demand of trained human resources to complete its goal of “Building Back Safer”. To support to the ongoing efforts of the Government of Nepal (GON), the National Reconstruction Authority (NRA) and other ministries and departments engaged in aspects of post-earthquake reconstruction and long-term economic development, National Society for Earthquake Technology – Nepal (NSET) is implementing Housing Reconstruction Technical Assistance Project (HRTAP) with the name Baliyo Ghar (alnof] 3/) Program with the core funding support from United States Agency for International Development (USAID) for the period of October 2015 – September 2020.
#BaliyoGhar program is a five-year Cooperative Agreement for Housing Reconstruction Technical Assistance with the goal of promoting earthquake safer housing reconstruction through owner-driven approaches.


In response to the huge need of trained human resources required for large scale reconstruction, the #BaliyoGhar program strives to carry out multi-disciplinary trainings and orientation programs with the main objective to ensure disaster- resilient construction of houses through awareness, training, demonstration and support on code compliance. The idea is to establish and institutionalize an organized and systematic approach for Nepal's earthquake reconstruction with built-in earthquake-resistance of buildings.
NSET implements Baliyo Ghar program in collaboration with and under the guidance of the National Reconstruction Authority (NRA), Ministry of Urban Development (MOUD), Department of Urban Development and Building Construction (DUDBC), Ministry of Federal Affairs and Local Development (MOFALD), and other relevant ministries and departments.

BACKGROUND
The earthquake of April 25, 2015 and the sequence of aftershocks caused 8,700 deaths and around 25,000 injuries. The Government of Nepal (GON)’s Post-Disaster Needs Assessment (PDNA), completed on June 15, 2015, found that total value of damage and losses resulting from the earthquake sequence amounted to about US$7 billion, and reconstruction needs amounted to about US$6.7 billion. The earthquake sequence destroyed 490,000 houses - mostly traditional mud-brick and mudstone houses built and occupied by the rural poor; and rendered another 265,000 houses at least temporarily uninhabitable. The data even high up with studies and updates of later times. The largest single need identified in the PDNA is housing and human settlements, accounting for $3.27 billion in reconstruction costs, or almost half of the total needs.

The reconstruction need is huge and there is a high possibility that people would rebuild their houses in the traditional non-earthquake-resistant manner and non-compliant to the national building code, if they are not properly guided and supported for safer reconstruction. This makes the settlements yet more vulnerable to future earthquakes. This should be changed. Building Back should definitely be Better! Nepal's past experiences have demonstrated that if people are guided and local masons are trained, they will construct in a safe manner. Therefore, there is a huge need for providing technical support to the people for earthquake safer reconstruction.

THEORY OF CHANGE
The “Baliyo Ghar” program will contribute towards developing disaster resilient communities in Nepal by standardization of guidelines/manuals, enhanced local capacity as well as increased awareness on disaster resilient construction through development of disaster/earthquake resilient construction guideline/manual/curricula ; capacity building of construction workforce and awareness raising of community; , provided that people are able to reconstruct their houses through owner driven approach linked with compliance mechanism and financial assistance.

GUIDING PRINCIPLES
BaliyoGhar follows following main principles that will guide the Housing Reconstruction Technical Assistance Program           
    Housing Reconstruction through owner led and owner driven approaches,
    Blanket Technical Assistance Reaching to Every Household
    Country-led policies and processes:
    Inclusion and access:
    Integrating DRR and promotion of disaster resilient construction:
    Flexibility and context specific approaches:
    Longer-term and sustainable approach:
    Follow national and international standards and practices:
    Robust monitoring and evaluation system:

TARGET GROUP
The project targets mainly following five groups of beneficiaries at various levels:
1.   Construction workers – masons (brick-layers, stone-layers, concrete workers), carpenters, bar-benders, contractors; termed as "mason" in general
2.   Social mobilizers – community mobilizers, social activists
3.   Technical professionals – engineers, sub-engineers, architects, structural engineers
4.   Common people – house-owners, consumer groups and other groups of people such as Mother's groups
5.   Policy and decision makers – officials at municipalities and VDCs, political leaders, officials at ministries and departments

INDICATORS
Impact Indicator
Proportion of houses reconstructed adopting disaster resilient construction methods in the program areas.

Outcome Indicator
    Number of technical guidelines/manuals/training curricula for disaster resilient construction technologies approved by government
    Proportion of houses that deploy at least one trained mason while constructing their house
    Percentage change in the perception of population on disaster resilient construction

Output Indicator
    Number of technical guidelines/manuals on disaster/earthquake-resistant technologies/solutions/designs for local building types adapted/developed/amended/published
    Number of Curricula for awareness and training (including instructor development) adapted/ developed/published
    Number of Instructors Trained for conducting training and awareness programs
    Number of Construction workforce (engineers, architects, contractors, masons, carpenters, bar-benders) trained on earthquake-resistant / disaster-resilient housing reconstruction
    Number of Social mobilizers trained on promoting earthquake-resistant construction technologies
    Number of Government Officials trained on promoting and implementing earthquake safer housing reconstruction program
    Number of House-owners and other common people made aware on disaster resilient construction through orientation sessions and door-to-door campaign
    Number of IEC materials (print, audio and video materials) on disaster resilient construction methods prepared and disseminated
    Number of Demonstration models on earthquake-resistant construction technology demonstrated

GEOGRAPHICAL COVERAGE

The program is focused in earthquake most affected 14 districts and more specifically implemented in 3 districts: Dolakha, Dhading, Nuwakot and Kathmandu of Nepal